Like Mary, I have trouble with one flight most days. It's my morning wakeup call shortly after 6 am, whether I want it or not.
I recall discussion some time ago indicating a freight flight benefitted from that departure route because it saves them a few minutes of flight time to a particular destination.

Gary

From: Neighbors_nobhill-nm <neighbors_nobhill-nm-bounces@mailman.swcp.com> on behalf of Mary H Smith via Neighbors_nobhill-nm <neighbors_nobhill-nm@mailman.swcp.com>
Sent: Tuesday, October 6, 2026 7:43 PM
To: Dean Williamson <dean.g.williamson@gmail.com>; neighbors_nobhill-nm@mailman.swcp.com <neighbors_nobhill-nm@mailman.swcp.com>
Subject: Re: [Neighbors] Airport noise
 

This entire conversation is really enlightening – thank you all.

 

My particular complaint about airport noise is the flight most every day between 1:30 a.m. and 2:00 a.m. Between the FlightAware app and AI, it appears this near daily noise in the middle of the night is an Amazon freight flight headed to the Midwest – Kentucky and/or Ohio. This plane flies directly over my house. The daytime noise, I can live with. Daily flights in the middle of the night, is outrageous.

 

Mary

Aliso NE

 

From: Neighbors_nobhill-nm <neighbors_nobhill-nm-bounces@mailman.swcp.com> On Behalf Of Dean Williamson via Neighbors_nobhill-nm
Sent: October 6, 2026 7:03 PM
To: neighbors_nobhill-nm@mailman.swcp.com
Subject: [Neighbors] Airport noise

 

The historical comparison is interesting, but not really relevant.  And while the complaint line may make you feel better, it won't change airport operations.

The answer to reducing air traffic over Nob Hill and surrounding areas is establishing a formal Runway Use Program (RUP).  The Sunport currently lacks such a program, which results in the active runway changing from the "calm wind" east/west runway (08/26) to the northeast/southwest runway (03/21) any time the winds change 5 knots or greater.  Generally, with a RUP in place, the primary runway 08/26 must be used until there is a 10-knot tailwind or a 25-knot crosswind (among other limitations).

Implementing an active Runway Use Program with a 10-knot tailwind ceiling at the Sunport would structurally redirect an estimated 65% to 75% of late-night and calm-weather traffic away from the secondary Runway 03/21 corridor, significantly reducing low-altitude noise over Nob Hill and the University area.

So how do we get a RUP in Albuquerque?
(courtesy of Claude)

## Step 1: Mobilize Civic and Political Pressure
The FAA will not initiate a structural review unless the airport proprietor (the City of Albuquerque) formally requests it.
* Lobby the Aviation Department & City Council: Neighborhood coalitions (like those in Ridgecrest, Parkland Hills, and Four Hills) must build a unified front. The objective is to pressure the Albuquerque City Council and the Mayor to fund an airport noise compatibility initiative.
* Leverage the Air Force Intergovernmental Agreement: Because ABQ is a joint-use facility with Kirtland Air Force Base, any initiative must also include coordination with base leadership to prove that proposed preferential routing will not compromise military readiness or training mission safety.

## Step 2: Conduct an FAR Part 150 Noise Study
To legally justify changing runway priorities to the FAA, the city must complete a formal FAR Part 150 Noise Control and Land Use Compatibility Study.

* Noise Contour Mapping: The city hires aviation consultants to create detailed computer models mapping out noise contours (DNL lines) over surrounding neighborhoods.
* Establish Disproportionate Impact: The study must scientifically prove that a preferential runway program would substantially reduce the overall number of local residents exposed to severe noise levels without creating an unsafe burden on flight safety.

## Step 3: Draft the Preferential Runway Proposal
If the Part 150 study confirms that an RUP is a viable solution, the city drafts a formal proposal outlining specific operational rules. To pass FAA safety guidelines, this proposal must include explicit guardrails: 
* Wind Thresholds: Preferential paths must instantly terminate if wind conditions surpass safety limits (such as a 10-knot tailwind or 25-knot crosswind), reverting control back to standard into-the-wind routing.
* Capacity Safeguards: The RUP cannot cause significant flight delays, gridlock, or bottlenecking during the Sunport's peak commercial travel hours.

## Step 4: FAA Safety Review and Formal Approval
The completed package is submitted to the FAA. It undergoes rigorous internal scrutiny across multiple divisions, including Air Traffic Control, Flight Standards, and Airport Environmental Safety.

So why don't we already have a RUP?  What similar sized cities have one?


1. Reno, Nevada (Reno-Tahoe International Airport - RNO)
2. Tucson, Arizona (Tucson International Airport - TUS)
3. Boise, Idaho (Boise Airport - BOI)
4. Sarasota / Bradenton, Florida (SRQ)

How did these cities succeed?
In every one of these peer examples, the programs were achieved because the local city councils or county aviation authorities actively funded and sustained a formal FAR Part 150 Noise Compatibility Study. This provided the definitive radar data and noise contour maps required to legally convince the FAA that a specialized runway selection plan would protect residents without sacrificing airfield safety

 

The Bottom Line

The bottleneck is rarely the FAA's willingness to review a plan—it is the local political will and funding required by the city to kick off the expensive FAR Part 150 study. Advocacy groups looking for change usually start by packing local City Council zoning meetings to request funding for a new master noise study.