Hello Everyone,
From Monday, June 12, to Wednesday, June 14, SRD personnel, FOSM volunteers, and the TTYL/YCC crew removed half of an old vehicle gate, installed a post at the remaining gate, installed a steel pipe limiter,
and installed a 100-foot welded steel pipe fence on each side of the limiter/gate.
The report of this project is attached as a Word document.
Sam Beard, Projects Chair
Friends of the Sandia Mountain